Anmore permits

Do You Need a Permit to Re-Roof in Anmore?

In Anmore, building permits come from the Village of Anmore, not Port Moody. Under "When Do I Not Require a Permit?" the Village's guide names "Roofing repair or replacement", and it adds that the guide itself is not a bylaw. Structural changes are a different matter, so we confirm per address.

Reviewed by Scott Plumptree, Director of Marketing, The Interlock Group · Updated October 24, 2026

Consultations on Zoom or at your home. Book a Zoom consultation

Permits issued by

Village of Anmore, 2697 Sunnyside Road

anmore.com

Roofing repair or replacement

Listed under "When Do I Not Require a Permit?"

Village of Anmore permit guide, revised 2026-07-29

Governing bylaw

Building Bylaw No. 583-2018

Village of Anmore permit guide

Wildfire

The entire village is considered a Wildland Interface Zone

anmore.com Wildfire Information

The Village of Anmore issues its own permits

Anmore is its own municipality, incorporated in 1987, and the Village office at 2697 Sunnyside Road handles building permits. Both main roads, Sunnyside and East Road, run down into Port Moody, but a house on them inside the village boundary answers to Anmore's rules, not the City's.

What Anmore's permit guide says about roofs

The Village's guide "Do I Need a Building Permit?", revised on July 29, 2026, has a section headed "When Do I Not Require a Permit?" It lists "Roofing repair or replacement" there, along with painting, cabinets, landscaping and fencing.

The guide is careful to say it "has been prepared for convenience only and is not a bylaw or legal document." If it ever conflicts with a Village bylaw, the bylaw wins, and homeowners remain responsible for meeting Building Bylaw No. 583-2018 and the BC Building Code.

When an Anmore roof job changes the structure

The same guide exempts exterior repairs such as siding, trim or stucco only where no structural changes are made, giving moving or enlarging windows and doors as examples. We apply the same caution to roofs. Cutting in a skylight, adding a dormer or replacing rafters changes the structure, and the guide's permit checklist calls for sealed structural drawings on that kind of work.

Anmore as a Wildland Interface Zone

The Village's wildfire page says "the entire village is considered a Wildland Interface Zone, and we are at a higher risk." In October 2024 the Village announced a $32,000 Community Resiliency Investment grant for a Community Wildfire Resiliency Plan covering all neighbourhoods, about 500 hectares. Any new rules that come out of that work could affect roofs, so we check the current position for your lot.

How we handle permits on an Anmore roof

We confirm per address with the Village before the job is booked. If the work needs a building permit, we apply for it. If it does not, we still install to the BC Building Code and to manufacturer specification, since the Village's guide leaves that responsibility with the owner.

Anmore questions, answered

My address says Port Moody. Which office do I deal with?

It depends on where the lot sits, not the mailing address. If it is inside the Village of Anmore boundary, the Village office on Sunnyside Road issues permits. We check the jurisdiction for your property before we quote.

Is there anything I must do before replacing my Anmore roof?

For a straight replacement, the Village's guide lists roofing as work that does not require a permit. You still need to meet the BC Building Code and Village bylaws. If trees on your lot will be cut to make room, ask the Village first.

Does Anmore require a fire-rated roof?

We did not find a roof rating rule on the Village pages we checked, and its wildfire plan was still funded work in 2024. Our roofs are Class A Fire Rated Available, as a complete assembly, which suits a village the Village itself calls a Wildland Interface Zone.

Sources for this Anmore guide

  1. Village of Anmore — Do I Need a Building Permit? (revised 2026-07-29)
  2. Village of Anmore — Wildfire Information
  3. Village of Anmore — Community Wildfire Resiliency Plan news release (October 8, 2024)
  4. Wikipedia — Anmore (elevation, zoning, roads)

Product specifications are the manufacturer's (Interlock Roofing). Install counts are from our own job book. Reviewed by Scott Plumptree, October 24, 2026.

Planning a new roof in Anmore?

A fixed price in writing after one visit, on Zoom or at your home. Most BC homeowners choose Zoom. Interlock Metal Roofing (BC) Ltd. · 9969 River Way, Delta, BC V4G 1M8

Interlock metal roofing — get a free quote